Electro-acoustics and Video
TV / Radio Studio Complex |
Oman |
Client: |
Ministry of Information |
Date: |
2004 2008 |
The Ministry intended to establish an entirely new, digital TV Studio Complex with various studios, ranging from 300m2 to 1,500m2 in size, using ultra-modern technology.
Austroconsult was engaged in planning, detailed engineering, elaboration of tender documents, evaluation of offers and implemen- tation supervision.
|
|
FEED and EPIC Aerial Surveillance |
United Arab Emirates |
Client: |
Abu Dhabi Police |
Date: |
2008 2011 |
Aerial surveillance capabilities, operating range and quality of service were to be improved by upgrading the helicopter fleet with state-of-the-art visual surveillance and tracking equipment.
Austroconsult is responsible for project management and has elaborated surveys, specifications, detailed technical design, determination of optimum technology, etc.
|
|
C4I Project Co-ordination |
GCC |
Client: |
GCC |
Date: |
2003 2011 |
|
|
Air Defence Modernisation Program / Airfields |
Austria |
Client: |
Austrian Government |
Date: |
2007 2008 |
|
|
SCADA System for Road Tunnel Surveillance |
Austria |
Client: |
Government of the Tyrol |
Date: |
2004 2007 |
For the surveillance of more than twenty road tunnels, a centralised control system was to be established. The SCADA system is located in the integrated command and control centre for emergency services.
Austroconsult, the expert planner of the SCADA system, performed services such as survey of existing installations, detailed planning, specifications, etc.
|
|
Operation Rooms |
United Arab Emirates |
Client: |
Abu Dhabi Police |
Date: |
2010 2011 |
|
|
Command and Control / Integrated Operation Centre |
Austria |
Client: |
Government of the Tyrol |
Date: |
2004 2010 |
An integrated command and control centre for emergency services with highly sophisticated call-taking and dispatching systems was to be established.
Austroconsult was entrusted with the survey of user requirements, detailed planning and definition of specifications, elaboration of tender documents and evaluation and advice during the award process.
|
|
Operation Centre and Radio Network |
Austria |
Client: |
Municipality of Vienna |
Date: |
2005 2006 |
The command and communication facilities of the Viennese emer- gency and utility services were to be upgraded, using SCADA for creating a real-time status picture.
Austroconsult was engaged in the survey, elaboration of specifi- cations and tender documents, evaluation and also rendered advice during the award process.
|
|
Road Traffic Control and Urban Security |
Austria |
Client: |
Municipality of Moedling |
Date: |
2004 2005 |
The municipality intended to introduce a new concept concerning road safety (e.g., speed monitoring), fee parking and security for the towns inhabitants and businesses.
Austroconsult was engaged in the definition of services, planning, tendering, founding of the PPP company and supervision of rollout.
|
|
Digital Trunked Radio System |
Austria |
Client: |
Ministry of Interior |
Date: |
2001 2003 |
The Ministry intended to implement a TETRA system for Police and Gendarmerie as well as for rescue, ambulance and other govern- mental and regional emergency services.
Austroconsult was engaged in setting up the PPP model, system planning, tendering, advisory and engineering activities.
|
|
Digital Trunked Radio System |
United Arab Emirates |
Client: |
Abu Dhabi Police |
Date: |
1996 2009 |
The Police intended to modernise its entire telecommunications and IT system (TETRA). Most modern command software was to support day-by-day and emergency activities.
Austroconsult was engaged in surveys, propagation planning, field strength measurements, design, project supervision as well as commissioning.
|
|
Security and IT Systems Industrial Complex |
Kuwait |
Client: |
SDFC |
Date: |
2004 2006 |
Security of one of the main industrial complexes of Kuwait which comprises refineries, power plants, port installations, chemical and electronic industry and general production plants was to be enhanced.
Austroconsult was responsible for threat analysis, preliminary planning, detailed engineering, tender documents, evaluation of offers and supervision.
|
|
|