Information and Communication Technology
C4I Project Co-ordination |
GCC |
Client: |
GCC |
Date: |
2003 2011 |
|
|
Telecommunication Network Enhancement Project
|
Turkmenistan |
Client: |
Ministry of Communication |
Date: |
2019- |
The Government of Turkmenistan with support of the Islamic development Bank decided to address the developments in the IT world by initiating the upgrade of the country’s entire communication systems.
Austroconsult is engaged in planning, conceptual engineering, elaboration of tender documents, evaluation of offers and supervision of several project packages.
|
|
Data Center Commissioning Agent |
Oman |
Client: |
Omantel |
Date: |
2021- |
Omantel and Equinix intended to establish an entirely new, Data Center with directly connected to multiple international fiber optic submarine cable links.
Austroconsult is engaged in this Data Center project as Commissioning Agent ensuring the timely execution of the project according specification.
|
|
IT Infrastructure Revamping
|
Oman |
Client: |
Public Authority for Social Insurance |
Date: |
2016 2017 |
Revamping of PASI’s IT infrastructure became necessary in order to be in a position to provide a highly available IT system as a service to the stakeholders.
Austroconsult is engaged in the study and review of the current infrastructure, devising the future design, compilation and preparation of tender documents, tender evaluation and implementation supervision.
|
|
Business Continuity & IT Disaster Recovery |
Oman |
Client: |
Ministry of Defense - Oman |
Date: |
2016 2020 |
Based on the prior studies the Ministry decided to proceed with the execution of the Business Continuity & IT Disaster Recovery project.
Austroconsult was engaged in conceptual design, the preparation of tender and the evaluation of offers inluding technical supervision of the execution of the project.
|
|
Intelligent Data Center Infrastructure |
Oman |
Client: |
Central Bank of Oman |
Date: |
2017 2020 |
he Central Bank of Oman were building an entirely new Tier IV Data Center for coping with the increased data processing requirements in the financial world.
Austroconsult was engaged for the design of the Intelligent IT infrastructure and the supervision of execution from detailed engineering, elaboration of tender, evaluation of offers, including commissioning and handover.
|
|
FEED and EPIC Aerial Surveillance |
United Arab Emirates |
Client: |
Abu Dhabi Police |
Date: |
2008 2011 |
Aerial surveillance capabilities, operating range and quality of service were to be improved by upgrading the helicopter fleet with state-of-the-art visual surveillance and tracking equipment.
Austroconsult is responsible for project management, elaboration of surveys, specifications, detailed technical design, determination of optimum technology, etc.
|
|
Air Defence Modernisation Program / Airfields |
Austria |
Client: |
Austrian Government |
Date: |
2007 2008 |
|
|
Operation Rooms |
United Arab Emirates |
Client: |
Abu Dhabi Police |
Date: |
2010 2011 |
|
|
Command and Control / Integrated Operation Centre |
Austria |
Client: |
Government of the Tyrol |
Date: |
2004 2010 |
An integrated command and control centre for emergency services with highly sophisticated call-taking and dispatching systems was to be established.
Austroconsult was entrusted with the survey of user requirements, detailed planning and definition of specifications, elaboration of tender documents and evaluation and advice during the award process.
|
|
Operation Centre and Radio Network |
Austria |
Client: |
Municipality of Vienna |
Date: |
2005 2006 |
The command and communication facilities of the Viennese emergency and utility services were to be upgraded, using SCADA for creating a real-time status picture.
Austroconsult was engaged in the survey, elaboration of specifi- cations and tender documents, evaluation and also rendered advice during the awarding process.
|
|
Radio and Despatching System |
Austria |
Client: |
Government of Salzburg Province |
Date: |
2001 2005 |
The Regional Government / Fire Brigade being responsible for the provinces civil defence activities planned to renew their entire communication systems for voice, data and alarm functions.
Austroconsult was the consultant for the project and was engaged in planning, tendering, supervision and commissioning.
|
|
Nuclear Early Warning System |
United Arab Emirates |
Client: |
Abu Dhabi Police |
Date: |
2006 2008 |
Taking into account the threat potential emanating from civilian nuclear power plants as well as from military nuclear installations and missile carrier systems, it was contemplated to establish a nuclear early warning system.
Austroconsult was engaged in the assessment of requirements, the threat analysis and study work.
|
|
IT Disaster Recovery Planning |
Oman |
Client: |
Ministry of Defence |
Date: |
2005 2007 |
An IT Disaster Recovery Plan and Centre were to be established to ensure business continuity of vital institutions and organisations in critical situations.
Austroconsult was engaged in threat and risk assessment of present installations, server clusters, business impact analyses, planning of the disaster recovery centre including the technical fit out.
|
|
IT Disaster Recovery Centre |
Romania |
Client: |
Industry |
Date: |
2008 2009 |
An IT Disaster Recovery Centre was planned so as to offer business continuity services.
Austroconsult was engaged in requirement assessment, design studies, server clusters, surveys, business impact analysis, elaboration of a business plan, general project management activities, technical fit out as well as the development of marketing concepts.
|
|
RFID Road Traffic Applications Test Project |
Austria |
Client: |
Ministry of Transport |
Date: |
2006 2008 |
Lab tests and a pilot test concerning active and passive RFID systems were carried out to assess suitability for use in different areas of application.
Austroconsult elaborated the test arrangement concept, co-ordinated all parties involved and took over test monitoring and documentation as well as compilation and analysis of test results.
|
|
SCADA System for Road Tunnel Surveillance |
Austria |
Client: |
Government of the Tyrol |
Date: |
2004 2007 |
For the surveillance of more than twenty road tunnels, a centralised control system was to be established. The SCADA system is located in the integrated command and control centre for emergency services.
Austroconsult, the expert planner of the SCADA system, performed services such as survey of existing installations, detailed planning, specifications, etc.
|
|
Road Pricing / Toll System |
Austria |
Client: |
ASFINAG |
Date: |
1998 1999 |
The ASFINAG, the Austrian Motor- and Expressway Financing Corporation, planned to introduce a toll collection system for lorries in the Unterinntal, on one of Austrias most frequented motorway sections.
Austroconsult was contracted for the technical engineering of the toll, electricity, communications and electronic data processing lots.
|
|
Third Extension Stage of Vienna Underground |
Austria |
Client: |
Vienna Lines |
Date: |
2000 2007 |
In the course of further network extension, Vienna Lines, the operators of Viennese underground, trams and buses, intended to install digital communication, signalling and information systems.
Austroconsult rendered consultancy services for requirements assessment and elaboration of specifications and was involved in test regimes and controlling.
|
|
Road Traffic Control and Urban Security |
Austria |
Client: |
Municipality of Moedling |
Date: |
2004 2005 |
The municipality intended to introduce a new concept concerning road safety (e.g., speed monitoring), fee parking and security for the towns inhabitants and businesses.
Austroconsult was engaged in the definition of services, planning, tendering, founding of the PPP company and supervision of rollout.
|
|
Fibre Optic Backbone Infrastructure Civil Works |
United Arab Emirates |
Client: |
du |
Date: |
2008 2010 |
DU, the major UAE telecom provider, implemented a fully equipped 850 km fibre optic backbone network to connect their base stations and switch infrastructure with a high speed communication network.
Austroconsult was contracted as client representative for project management and supervision services like, e.g., quality assurance and day-to-day site supervision.
|
|
Optical Fibre Network |
United Arab Emirates |
Client: |
Armed Forces |
Date: |
1994 2004 |
A telecommunications system based on 6,000 km optical fibre land and 1,000 km multi fibre sea cable with SDH technology for the microwave network and mobile communication installations was established.
Austroconsult was engaged in surveys, planning, engineering, preparation of tender documents, evaluation, supervision and commissioning.
|
|
Optical Fibre Sea Cable Telecom Project |
Cape Verde Islands |
Client: |
Cabo Verde Telecom |
Date: |
1995 2001 |
The Cape Verde Islands were interconnected by troposcatter and microwave communication links of limited capacity. Also, the telephone networks on Santiago Island served only a few thousand subscribers.
Austroconsult provided studies, propagation planning, field strength measurements concerning the back-up microwave systems, design as well as supervision.
|
|
Telecommunications Network Optimisation |
United Arab Emirates |
Client: |
Abu Dhabi Distribution Company |
Date: |
2007 2009 |
In view of telecom liberalisation a custom-tailored concept offering perfect solutions for the last mile problem and future application of fibre-to-the-home and fibre-to-the-curb was to be developed.
Austroconsult was contracted for surveys, studies, and development of vision and strategy as well as of operational concepts.
|
|
Telecommunications Network Optimisation |
United Arab Emirates |
Client: |
TRANSCO |
Date: |
2005 2007 |
Telecom liberalisation and the need for network improvement initiated modernisation / expansion of the telecom network concerning various installations, e.g., sub-stations and the SCADA network.
Austroconsult was contracted for surveys, studies, strategy, operational concepts, database management, tender documents and evaluation of offers.
|
|
TETRA and SCADA Network |
United Arab Emirates |
Client: |
ADCO |
Date: |
2003 2007 |
ADCO intended to establish a region-wide digital mobile tele- communications network based on TETRA standards for their entire concession area, i.e., onshore as well as offshore.
Austroconsult was contracted for studies, elaboration of design, coverage planning, tender documents and evaluation of offers.
|
|
Security and IT Systems Industrial Complex |
Kuwait |
Client: |
SDFC |
Date: |
2004 2006 |
Security of one of the main industrial complexes of Kuwait which comprises refineries, power plants, port installations, chemical and electronic industry and general production plants was to be enhanced.
Austroconsult was responsible for threat analysis, preliminary planning, detailed engineering, tender documents, evaluation of offers and supervision.
|
|
Digital Trunked Radio System |
United Arab Emirates |
Client: |
Abu Dhabi Police |
Date: |
1996 2009 |
The Police intended to modernise its entire telecommunications and IT system (TETRA). Most modern command software was to support day-by-day and emergency activities.
Austroconsult was engaged in surveys, propagation planning, field strength measurements, design, project supervision and commissioning.
|
|
Digital Trunked Radio System |
Austria |
Client: |
Ministry of Interior |
Date: |
2001 2003 |
The Ministry intended to implement a TETRA system for Police and Gendarmerie as well as for rescue, ambulance and other govern- mental and regional emergency services.
Austroconsult was engaged in setting up the PPP model, system planning, tendering, advisory and engineering activities.
|
|
MW Broadcasting Station New Dammam |
Saudi Arabia |
Client: |
Ministry of Information |
Date: |
2000 2006 |
Operational problems caused by the sites regular flooding as well as by shortfalls in coverage led to the intention to upgrade and modernise the medium wave and FM broadcasting station in Dammam.
Austroconsult was entrusted with the feasibility study, design, elaboration of tender documents and project supervision.
|
|
TV Coverage |
United Arab Emirates |
Client: |
EMI, Public Works Department |
Date: |
1993 2005 |
EMI set up a second chain of transmitters and modernised the existing ones at Liwa, Jebel Dhanna, Jebel Hafit, Bu Hasa and Al Maqam.
Austroconsult was entrusted with the survey work, field measure- ments, propagation planning, elaboration of system design, specifications and tender documents, evaluation of offers and supervision.
|
|
Railway Data Centre Relocation |
Austria |
Client: |
Austrian Federal Railways, IT Department |
Date: |
2010 |
Due to the increasing number of critical IT-applications, the Austrian Federal Railways (ÖBB) decided to opt for a most modern and secure two data centre-strategy.
Austroconsult was engaged in cataloguing and co-ordination activities, general relocation planning and tendering procedures.
|
|
GSM-R and Signalling System |
Slovenia |
Client: |
Slovenian Railways |
Date: |
2002 2004 |
Modernisation of the entire communication signalling system for the 1,500 km of railway tracks in Slovenia was envisaged.
Austroconsult was entrusted with elaboration of requirements, carrying out a survey, basic specifications and technology studies on the optimum design for the signalling and communication system.
|
|
TV / Radio Studio Complex |
Oman |
Client: |
Ministry of Information |
Date: |
2004 2008 |
The Ministry intended to establish an entirely new, digital TV Studio Complex with various studios, ranging from 300m2 to 1,500m2 in size, using ultra-modern technology.
Austroconsult was engaged in planning, detailed engineering, elabo- ration of tender documents, evaluation of offers and supervision.
|
|
|